The Town of Carleton Place’s Public Works Department strives to keep our residents informed of this year’s construction activities however, schedules are subject to change due to weather conditions, changes in the provision of materials and/or availability of staff.  The following activities are planned for next week:

Gillies Bridge

Concrete removals are now completed and crews will be starting preparations to form the new concrete at the abutments. The rehabilitation of the bridge girders is continuing.

The Town of Carleton Place would like to remind residents that for safety reasons, pedestrians must use the OVRT to cross the Mississippi River.

Bell Street (Bridge Street to Mullett Street)

Paving operations have been delayed to the week of August 30th.

Moffatt Street (McRostie to High Street)

Now that the top lift of asphalt is completed, crews will be reinstating driveways and walkways where required.  Landscaping in damaged areas will be reinstated in September when cooler temperatures return.

McKenzie Street

Now that the top lift of asphalt is completed, crews will be reinstating driveways where required.  Landscaping in damaged areas will be reinstated in September when cooler temperatures return.

The Town of Carleton Place asks for everyone’s help in ensuring safe and efficient work zones.  We encourage residents to avoid all construction zones, however, should residents be travelling within the construction zones, we urge you to proceed with caution and follow the directions provided by traffic control personnel and posted construction signage.  We ask for everyone’s patience and cooperation during the construction season, however, should a member of the public have any concerns or questions of a general nature, please contact the Public Works Office at 613-257-2253.

A picture containing a bridge, a recently paved street and construction equipment